Long-term development plan for the power grid 2022

In just a few years there will be a need for transporting much more energy in the power grid because of a significant increase in renewable energy production far from consumers, who in turn will need much more electricity for heat pumps, electric cars, etc. How do we ensure that our future power grid is geared for the green transition?

On this page, you can gain insight into the future development needs of the power grid and possible solutions as we head towards a more climate-friendly society by 2040. You can download the reports at the bottom of this page.
Stakeholder map

 

Why is Energinet working with long-term development plans for the electricity and gas systems?

Big changes are taking place in our energy landscape, which will look very different in the coming decades driven by the green transition and the Danish climate target to reduce CO2 emissions by 70 per cent by 2030. This requires full speed on the green transition of our energy systems. Changes, reinforcements, and expansions of both our electricity and gas systems are needed if our Danish energy system is to support the development all the way to our green target. 

At the same time, we at Energinet must stay focused on our core task: To always ensure safe operation and security of supply in the existing energy systems. Also, we must get input and host a close dialogue across society and stakeholders.

Therefore, we work with long-term development plans for both the electricity and gas systems, both based on the Danish Energy Agency's Analysis Assumptions for Energinet from 2020 (AF20). The Analysis Assumptions provide a likely scenario for developments in the consumption and production of gas and electricity, which are aligned with the political objectives.

The long-term development plans are split into targeted reports, each with its aim. The reports just released below identify future needs of the electricity and gas systems and possible solutions. They will form the basis of the dialogue with society and our stakeholders. Based on the input from this process the final long-term development plan (LUP) will be published in 2022.

  .

DOWNLOAD REPORTS: 

Long-term development plans for the electricity system

  • The needs analysis for electricity: Forms the basis for decisions around investments and the solutions which must ensure the security of supply in a green future. Download report.  
  • Solutions catalogue for electricity: Based on the defined needs in the needs analysis, the solution catalogue provides one or several suggestions for solutions that will help us succeed with the green transition. Download report
  • Download background material for the needs analysis: Download report (in Danish)

Long-term development plans for the gas system

  • The needs analysis for gas: Forms the basis for decisions around investments and the solutions which must ensure the security of supply in a green future. Download report
  • Solutions catalogue for gas: Based on the defined needs in the needs analysis, the solution catalogue provides one or several suggestions for solutions that will help us succeed with the green transition. Download report
  • Download background material for the needs analysis: Download report (in Danish)
 
 

SUBSCRIBE TO REPORTS

Receive notification directly by mail.