Regulations for system operation

This webpage will be updated as new system operation regulation revision are prepared and translated into English.

System operation concerns the regulation of system operation and responsibilities related to system opretaion and also operational reserves, operational procedures, operational planning, staff training and emergency preparedness, requirements for control equipment in coltrol centres and requirements for exchange of operational measurements (including real-time measurements and operational status). Furthermore, the regulations for system operation set the requirements for handling emergency preparedness situations and system disturbances, e.g. frequency load shedding and disconnection of electricity generation.

Please note that in case of any discrepancies between original Danish versions and translations, the Danish version of the text applies.

 

Technical regulation 3.4.2 Manual load-shedding of transmission-connected demand facilities

Technical regulation

No. Title Effective from
3.4.2 Technical regulation 3.4.2 Manual load-shedding of transmission-connected demand facilities 01.03.2021

 

Explanatory document

No. Title Current revision Published
3.4.2 Explanatory document for technical regulation 3.4.2 Manual load-shedding of transmission-connected demand facilities 1 14.04.2021

 

Agreement regarding operation of the interconnected Nordic power system (System Operation Agreement)

No. Title Current revision Effective from
Common Nordic System Operation Agreement Version 1 01.07.2006
System Operation Agreement - Appendices 23.06.2016

 

Technical regulation 5.1.2 Definition of plant status for thermal power stations connected to the transmission grid

No. Title Current revision Effective from
5.1.2 Definition of plant status for thermal power stations Revision 0 25.03.2015